
NewMed Energy (formerly Delek Drilling) is an Israeli energy company and a key partner in the Leviathan and Tamar natural gas fields in the Eastern Mediterranean, offshore Israel. When a project's process skids are ultimately destined for NewMed-operated or NewMed-affiliated development work, "approved supplier" isn't a marketing phrase — it's a specific, audited status that NewMed or its EPC contractor grants to individual manufacturers after a formal qualification process. For procurement and engineering teams in Italy sourcing process skids for this kind of work, understanding what that process actually involves is far more useful than searching for a badge.
This article explains what NewMed-linked vendor approval covers, the engineering baseline it's built on, and what to look for when qualifying a process skid manufacturer for NewMed-linked or NewMed-grade projects.
Vendor qualification on NewMed projects typically involves a detailed audit of a manufacturer's quality management system, welding procedures, material control, instrumentation and controls integration, and documented fabrication history. That audit is usually carried out by NewMed's own engineering and inspection teams, or by a third-party inspection agency acting on its behalf, and the resulting approval is specific to the manufacturer.
Because this status is granted directly by NewMed to a named manufacturer, it isn't something any supplier can claim without going through that process. What buyers researching suppliers can assess independently — before any formal audit — is whether a manufacturer's engineering and quality practices are already built to the level NewMed requires.
Regardless of a skid's final destination, the technical requirements that underpin NewMed-grade fabrication are largely the same requirements that govern quality process skid manufacturing generally:
ASME B31.3 for process piping and ASME Section VIII for any pressure-containing vessels mounted on the skid are the standard reference codes, with client engineering standards layered on top for offshore gas-development projects.
Full mill test certificates and heat-number traceability carried from raw plate, pipe, and fittings through to the finished, assembled skid.
Skid frame design that accounts for lifting, transport, and installed loading, with equipment layout engineered for accessibility, maintenance, and operator safety.
WPS and PQR documentation, with welders individually qualified under ASME Section IX, and piping fabricated and tested in accordance with the governing code.
Factory-installed instrumentation, control panels, and wiring, with loop checks and functional testing carried out before the skid leaves the shop.
Radiographic or ultrasonic testing of piping welds, and magnetic particle or dye penetrant testing on structural and pressure-critical joints where applicable.
A documented FAT covering mechanical completion, pressure testing, and functional performance of the fully assembled skid before shipment.
Hold-point sign-off from an accredited inspection body such as Lloyd's Register, Bureau Veritas, TÜV, or DNV at critical stages of fabrication.
A manufacturer that applies this level of control as standard practice — not only on projects with a named end client — is generally the one positioned to succeed if and when a formal NewMed audit takes place.
Notdstone manufactures customized process skids for the oil, gas, and process industries, serving Italy, the GCC, and international markets, with more than three decades of engineering experience across the team. Our fabrication and QA/QC processes are structured around the technical baseline described above — documented material traceability, ASME IX-qualified welding, factory-integrated instrumentation, and full factory acceptance testing before delivery.
To be clear with buyers researching this topic: formal vendor approval with NewMed Energy is issued directly by NewMed to specific manufacturers following its own audit process, and we're not claiming that status here. What we can speak to with confidence is the engineering rigor our process skids are built to on every project.
Factory-assembled modular skids integrating vessels, pumps, piping, and instrumentation to compress site installation time.
ASME Section VIII-compliant vessels engineered for safe containment under demanding pressure and temperature conditions.
API 650/620-referenced tanks for liquids, gases, chemicals, and petroleum products.
TEMA-designed shell-and-tube units for heating, cooling, condensation, and energy recovery.
Distillation, absorption, and stripping columns engineered for process efficiency in chemical and petrochemical service.
Custom-engineered reactors for controlled chemical processing and reaction management.
It means the manufacturer has been formally audited and accepted by NewMed Energy, covering their quality system, welding and piping procedures, and testing capability for skid fabrication.
ASME B31.3 governs the process piping, with ASME Section VIII applying to any pressure vessels mounted on the skid, often supplemented with NewMed's own engineering standards for offshore gas-development work.
For sour service or high-pressure gas streams, yes — NACE-compliant materials, corrosion-resistant alloys, or specialized internal and external coatings may be specified instead of standard carbon steel.
Yes, provided their code compliance, material traceability, and third-party inspection arrangements meet the project specification and export logistics support delivery of large, pre-assembled skid modules.
Ask for written confirmation of the approval status and its exact scope — which equipment categories it covers — rather than relying on a general claim.
If your project requires process skids engineered to international standards and manufactured under documented quality control, our engineering team can review your process requirements and provide a project-specific proposal. Get in touch with Notdstone to discuss your requirements.